Installation of technological equipment and engineering systems
1. Installation and removal of steam boilers:
- Drum type boilers with capacity of 30-100 tonnes of vapour per hour;
- Drum type boilers with capacity of 160-230 tonnes of vapour per hour;
- Drum type boilers with capacity of 620-670 tonnes of vapour per hour;
-
Drum type boilers with capacity of more than 670 tonnes of vapour per hour.
2. Installation and removal of boilers of Е, КЕ, DЕ, DSЕ, DKVr type with capacity of 2.5-25 tonnes of vapour per hour.
3. Installation of steam boilers components:
- economizers;
- heating surface units;
- supporting skirts;
- collectors;
-
auxiliary equipment
4. Installation of high and low pressure pipelines of power sites up to 500 MW.
5. Installation of air ducts and gas pipes of power sites up to 500 MW.
6. Installation of pipelines with the diameter of up to 1200 mm.
7. Installation of miscellaneous steelworks for construction and revamping of power engineering facilities: columns, beams, trusses, girders, racks, supports, framing, girts, tanks, support frames, containers with the diameter of up to 24 m etc.
8. Installation of non standard equipment and metalware.
9. Industrial construction, installation of terminal stations, warehouses, storage sheds from light-gage constructions.
12. Installation of gas supply.
11. Installation of heating systems, heat supply, water supply.